0 %

  • COMPETENCES

  • FACTORY

FACTORY

Manpower
 • Technical and Administrative Staff : 13 persons
 • Site Team : 17 persons

Areas
 • Total Factory Area : ~7000 m2
 • 2 Halls Indoor Application Area : ~4000 m2
 • Technical and Administrative Offices : ~1000 m2
 • Rest Areas : ~120 m2
 • Temperature and Humidity Controlled Warehouse : ~120 m2
 • Laboratory : ~25 m2
 • Hazardous and Non-Hazardous Waste Areas : ~20 m2

Site Equipment
 • 16 Cameras 7/24 Monitoring and Recording System
 • 600 kVA Transformer and Siemens Panels
 • 2 ea. Atlas Copco Inverter Air Compressors
 • Full Site Electricity and Air Infrastructure Line
 • Full Site Water System with Spare Tank
 • 2 ea. 10 Tons Cranes
 • SAPI (Germany) Sandblasting Hall with Automatic Separation and Recycling (18m x 6m x 5m)
 • 3 ea. Convertible Sandblasting/Painting/Metallization Halls (22m x 7m x 5m)
 • Fully Automatic Ventilation, Air Conditioning and Radiant Heating System
 • Termolog Fully Automatic Heat and Humidity Measurement and Recording System
 • Metallisation ARC150/S500 Thermal Spray Coating System
 • Wet Paint Steel Benches and Hanging Systems
 • GRACO Airless Painting Equipment
 • 2 ea. Forklifts
 • 2 ea. Pickup Trucks
 • Various Workstations, Storage, Handling, Transport and Packaging Equipment

Paint Mixing and Quality Control Laboratory
 • DeFelsko Advanced Body Surface Temperature and Relative Humidity Measurement Device
 • DeFelsko Advanced Body Surface Roughness Measurement Device
 • DeFelsko Positector 6000 Dry Film Thickness Measurement Device
 • Elcometer Dry Film Thickness Measurement Device
 • Elcometer Wet Film Coating Thickness Gauge
 • Elcometer 102 Needle Pressure Gauge
 • Elcometer Shot and Grit Comparators (ISO 8501-1)
 • Elcometer Dust Tape Test Kit (ISO 8502-3)
 • Elcometer Bresle Salt Kit
 • Elcometer Foil Set Scale
 • Computer and Printer
 • Microscope
 • Precision Balance
 • Paint Mixing and Preparation Equipment
 • Ventilation and Air Conditioning System